Jeffreys Bay
Wind turbine transport schedule 1 – 11 October

Jeffreys Bay is rapidly turning into a hub for renewable energy in South Africa and a number of windfarms are due to come online within the next few years in the region.

The huge turbines are being transported from Port Elizabeth and below is a schedule that travellers need to be aware of.

Transportation schedule:
30 September – 11 October 2013
Please be advised of the latest delivery schedule of components for the Jeffreys Bay Wind Farm. Wind turbines will be transported from the Port of Ngqura to the wind farm site near Humansdorp along the N2 or through Motherwell and Uitenhage joining the N2 at the Blue Horizon Bay exit).
Blades will leave the Port of Ngqura at approximately 6am. Other Components will leave port at approximately 9am.
Please note that this can change due to unforseen circumstances.
Date Load
Monday 30 September 2013
4 loads (incl. 3 blades) via route N2
1 load via route R334
Tuesday 1 October 2013
5 loads (incl. 3 blades) via route N2
1 load via route R334
Wednesday 2 October 2013
4 loads (incl. 3 blades) via route N2
Thursday 3 October 2013
5 loads (incl. 3 blades) via route N2
Friday 4 October 2013
5 loads (incl. 3 blades) via route N1
1 load via route R334
Monday 7 October 2013
2 loads via route N2
1 load via route R334
Tuesday 8 October 2013
4 loads (incl. 3 blades) via route N2
1 load via route R334
Wednesday 9 October 2013
2 loads via route N2
Thursday 10 October 2013
4 loads (incl. 3 blades) via route N2
Friday 11 October 2013
2 loads via route N2
1 load via route N1
View News By Category
News Archive